JOB SAFETY ASSESSMENT · ENERPAN BUILDING SYSTEMS
| Item | Y/N/NA | Key Checks | Controls / Notes |
|---|---|---|---|
| Access / Housekeeping | Walkways clear, lighting OK, area barricaded if needed | ||
| Material Handling | Unload plan, team lift / assist, stable loads, inspect panels | ||
| Tools / Equipment | Tools inspected, cords OK, GFCI, ladders / lifts checked | ||
| Fall / Elevated Work | 6 ft+ work reviewed, ladder / lift safety, tie-off if required | ||
| Pinch / Crush / Struck-By | Hand placement, exclusion zone, spotter, clear signals | ||
| Power Tool / Fastening | Guards in place, correct tool, flying debris controlled | ||
| Site / Weather Conditions | Wind, rain, mud, temperature, nearby trades / traffic |